Electric Tornado

Flashback | Thursday, October 4, 2018 | United States



A historical look at the Electric Tornado welding process and its role in fabricating massive penstock sections for the Parker Dam project.

Flashback Department Header

image

July 1941

Seven arc welding operators converge on a penstock section of the Parker Dam hydroelectric power project on the Colorado River at the border of Arizona and California. The entire penstock was fabricated in the field using the “electric tornado” process developed by Lincoln Electric. The process involved the placement of the large cylindrical segments on power driven rollers that turned the structure into position for welding.

Have any vintage (pre-1975) photos you’d like to share? Email them in jpeg format to publisher@arcmagazine.pub with a date the photo was taken (actual or approximate), a brief description (three or four sentences), and an email address where we can reach you for additional information.

image